Beach Drive Resurfacing
The purpose of this project is to reconstruct W Beach Dr with new pavement, curbs, and sidewalks. The sidewalk on the west side of the street may be a 12 foot wide multiuse path.
Ward 1 Street Resurfacing
Ward 1 local roads have experienced significant pavement deterioration and are in need of resurfacing.
Ward 2 Street Resurfacing
Ward 2 local roads have experienced significant pavement deterioration and are in need of resurfacing.
Ward 3 Street Resurfacing
Ward 3 local roads have experienced significant pavement deterioration and are in need of resurfacing.
Ward 4 Street Resurfacing
Ward 4 local roads have experienced significant pavement deterioration and are in need of resurfacing.