Beach Drive Resurfacing

The purpose of this project is to reconstruct W Beach Dr with new pavement, curbs, and sidewalks. The sidewalk on the west side of the street may be a 12 foot wide multiuse path.

More Info


Ward 1 Street Resurfacing

Ward 1 local roads have experienced significant pavement deterioration and are in need of resurfacing.

More Info


Ward 2 Street Resurfacing

Ward 2 local roads have experienced significant pavement deterioration and are in need of resurfacing.

More Info


Ward 3 Street Resurfacing

Ward 3 local roads have experienced significant pavement deterioration and are in need of resurfacing.

More Info


Ward 4 Street Resurfacing

Ward 4 local roads have experienced significant pavement deterioration and are in need of resurfacing.

More Info