Bayou George Drive Resurfacing
The project consists of repaving a portion of Bayou George Drive.
Cherokee Heights Road Resurfacing
The project consists of repaving the portion of Cherokee Heights Road that was not previously repaved.
Merritt Brown Road Resurfacing
The project consists of repaving a portion of Merritt Brown Road.
Allison Avenue Resurfacing
The project consists of repaving a portion of Allison Avenue from Front Beach Road to Panama City Beach Parkway
CR 389 Resurfacing
The project consists of repaving a portion of CR 389 from SR 390 to Baldwin Road.
CR 2297 Resurfacing
The project consists of repaving CR 2297 from Airway Road to Allanton Road.
Frankford Avenue Resurfacing
The project consists of repaving a portion of Frankford Avenue.
Highpoint Road Resurfacing
The project consists of repaving Highpoint Road from the bridge to McKenzie Avenue.
Indian Bluff Resurfacing
The project consists of repaving Indian Bluff Road from CR 2301 to Indian Bluff Drive.
Laird Street Resurfacing
The project consists of repaving Laird Street from Thomas Drive to Treasure Palm Drive.
Long Road Resurfacing
The project consists of repaving Long Road from New Church Road to Resota Beach Road.
Resota Beach Road Resurfacing
This project will link two other freshly paved sections of Resota Beach Road between Cedar Bluff Road and Hitchcock Road.
Silver Lake Road Resurfacing
This project consists of improving Silver Lake Road by repaving the surface from US Hwy 231 to Deep Springs Road.
Thomas Drive Resurfacing
This important project consists of repaving Thomas Drive from Bristol Street to Joan Avenue.